Check-list for configuring Mespelare nodes

This article is a check-list for configuring Mespelare nodes as I integrate them into my house’s lighting and power system. It describes the steps to follow to properly configure each node, so that I don’t forget anything.

Most of the configuration is documented in a master spreadsheet file, which lists all inputs and outputs, how they are physically connected (cabling) and how they are to be configured.

  • Load node registers
  • Load standard registers file (template)
  • Configure input-to-output mapping (based on teleruptors xls file)
  • Set output status registers to light up correct LEDs (based on which inputs are active)
  • Set output control registers for outputs 1-6 to 0x98 (152d)
  • Set output control registers for output 7 to 0x00 (disable)
  • Set output control registers for active outputs to 0x98 (152d)
  • Set output control registers for in-active outputs to 0x00 (disable)
  • Set subzone for outputs 1-6 to xxx (LED zone)
  • Set subzone for active outputs (based on teleruptors xls file)
  • Set control byte for inputs 1-6 to 0x01
  • Set input subzone for active inputs (based on frames xls file)
  • Update node registers
  • Save node registers to local file (backup)

Comments